- Role
- Design System Lead (design & code)
- Team
- Solo build, used by the WBR Creator and TuTr teams
- Duration
- Mar 2026 – ongoing
- Deliverable
- Token layer, 116 components, Storybook and Figma sync
- Problem
- Two AI products for the same operations programme were each drawing their own buttons.
- What I did
- I designed and coded it alone: a three-tier token layer, 116 React components, about 1,030 Storybook stories and a one-command Figma sync.
- Key decision
- Accessibility lives in the code. I fixed four tokens that failed contrast, and a hand-written override file keeps a Figma resync from undoing them.
- Outcome
- v2.1.0; 104 of 105 commits; ~1,030 Storybook stories; the spec behind WBR Creator and TuTr